CEIII GBP Submission (ArchiCAD)
______________________________________________________________________________________________________________________
Duration: 24 hours
Instructor: Wing Mang
Award: Certificate of Completion CEIII GBP Submission (ArchiCAD)
Cost: $10,800
_______________________________________________________________________________________________________________________
Minimum No. of students in Class: 8
Prerequisites
- Delegates should previously attended a CEI Basic Revit course or have experience in using the basic Revit tools and functionality.
Assessment Method
- By attendance, course work, quiz, examination, etc.
Course Content
- This is the advanced course for the formal Architectural Submission to the Authority using BIM technology. Submission includes:
- 1. Drawing generation of plans – section and elevations in prescribed format;
- 2. Area information extraction such as GFA, UFA, UFS, Site Coverage etc and prepare those areas plans;
- 3. Statutory calculation such as Means of Escape, Discharge Value, Sanitary Fitments requirements etc.
1. Introduction to GBP Submission
- 1.1 Introducing Traditional General Building Plan Process
2. Current Practice Note on BIM for GBP Requirements
- 2.1 ADM 9 Colouring of Plans
- 2.2 ADV 33 Essential Information in Plan Submissions
- 2.3 ADV 34 Building Information Modelling
- 2.1 ADM 9 Colouring of Plans
3. BIM Statutory Submission Drawings
- 3.1 BIM Workflow of producing GBP
- 3.2 Drawing Graphics Standards
- 3.2 Drawing Graphics Standards
- 3.1 BIM Workflow of producing GBP
4. BIM Produced Drawing Graphics
- 4.1 Layers
- 4.2 Labelling
- 4.3 Location Plan, Site Plan
- 4.4 Legend and Abbreviations
- 4.5 Notes
- 4.7 Emergency Vehicle Access
- 4.6 Graphic Overrides
- 4.6 Colouring
- 4.8 Floor Plans
- 4.9 Sections
- 4.10 Elevations
- 4.11 Fire Services Provisions Graphical Presentation
- 4.1 Layers
5. Data Extraction
- 5.1 UFA diagrams
- 5.2 GFA diagrams
- 5.3 Site Coverage diagram
- 5.1 UFA diagrams
6. Statutory Calculations
- 6.1 Fundamental Checking as per Current Practice Notes
- 6.2 Checking of Site Coverage, Plot Ratio, and dedication
- 6.3 Checking of Means of Escape
- 6.4 Checking of Sanitary Fitment Provision
- 6.5 Checking of Fire Compartment and Fire Resisting Construction
- 6.6 Discharge Value
- 6.7 TBE and Refuse Collection Point Calculations
- 6.1 Fundamental Checking as per Current Practice Notes
7 Creation of drawing sheets
- 7.1 Creation of drawing sheets
- 7.2 Setting the margin, border, title and countersign column content of a drawing sheet
- 8. Alteration & Addition
- 8.1 Existing Plan
- 8.2 Demolition Plan
- 8.3 New Construction
9. Archiving
- 9.1 Submission Version Control
- 9.2 Retrieval of Submission Drawings
10. Amendments
- 10.1 Current Practice – Hand amended information
- 10.2 Existing Information
- 10.3 New amendments
*If you have any feedback about our training course, please email to hongkong@a-c-i-d.com